The pipeline construction from Puyang(in Henan province) to Changzhou(zhong-chang
pipeline) commenced on the first day of Apl.1985 and completed on
Apr.28,1986. It has a total length of 361.89km, design pressure
5.1Mpa and an annual transportation capacity of 6 ¡Á108m3, supplying
gas for Changzhou chemical plant since Aug.7,1985. The pipeline
passes through railways at 4 places, roads at 38 places and rivers
at 92 places. The initial station is equipped with imported type
T4500 combustion gas turbine and two centrifugal compressors as
well as auxiliary equipments, being as the first gas transmission
pipeline installed with compression equipment in China. The pipes
were replaced on Oct.20,1999 and operating resumed on Oct.22,1999.
It was operated by the blockage operation department of the Pipeline
Technology Company, designed by the formal pipeline survey &
design institute and constructed by No. 2 & 3 pipeline companies.
|